Home / Questions / Fence permits

Do I need a permit for a fence in Hialeah?

Plan on one. Hialeah's Building Department publishes a fence and rolling gate checklist that asks for a notarized application, two recent surveys and the right construction details for your fence type. Vinyl and metal fences need signed and sealed details, and prefabricated wood panels need a Miami-Dade Notice of Acceptance.

Updated October 2026

What goes in a Hialeah fence permit?

  • Application. Signed and notarized by the owner and the contractor.
  • Surveys. Two copies, less than six months old and to scale, showing the fence, gates and total linear feet.
  • Construction details. The city's fence detail form for vertical wood, chain link or aluminum and iron picket fences, or signed and sealed details for PVC, metal and precast concrete fences.
  • Product approval. A Notice of Acceptance for prefabricated wood panels.
  • Utility letters if the fence encroaches on or closes off an easement.

As of October 2026, the city takes fence submittals online.

Can I pull the permit myself?

Yes, as an owner-builder. Hialeah asks for a homeowner's affidavit, a copy of your driver's license, and a notarized owner-builder disclosure statement and affidavit, and the owner has to appear in person. Most people let the contractor pull it, which puts the qualifier's name on the application.

What inspections should I expect?

  • Masonry and precast fences: a foundation or hole inspection.
  • Concrete fences and rolling gates: a mandatory footing inspection before the concrete is poured.

Before any digging, Sunshine 811 has to be notified at least two full business days ahead so underground lines can be marked.

When does the answer change?

It depends on the fence and the property. A pool barrier has extra rules (see pool fences). A fence over the city's height limits needs zoning relief (see how tall a fence can be). An HOA can require its own approval first. And if you live in Miami Lakes, Hialeah Gardens, Doral or Miami Springs, your city's building department sets the checklist, not Hialeah.

Sources: where can I read the rules myself?

The City of Hialeah's "Fence and Rolling Gate Requirements" document is the starting point; Miami-Dade County's fences and gates permit page explains the county's process; Sunshine 811's "When Can I Dig?" page covers utility locates. Rules change, so confirm with the Building Department before you build. Treat it as general information, not legal advice.

Want us to handle the paperwork?

We pull the permit, prepare the survey package and schedule the inspections as part of the job.

Get my free quote